Typically, there are six phases to any construction project, with each stage requiring the collaboration of various industry professionals. The process is like a carefully orchestrated event with all the players understanding their role. However, if you have never engaged a construction company in Boston, MA, to complete a building project for you, it is best to understand the primary stages.
Pre-Construction
Pre-construction is what brings the vision of the project to life. It involves planning, surveying, engineering, design, permits, and more. It is the roadmap for the rest of the project.
Sitework and Foundation
Breaking ground is the first tangible sign of building progress. Assuming you don’t need demolition services to clear the property of old structures, grading, excavation, and laying the foundation can proceed.
Rough Framing
Assembly of the building frame starts. The shape of the structure becomes apparent as the walls and floors go up.
Exterior Construction
Sealing the building means installing exterior walls to protect the building from the elements. It includes windows, doors, siding, roofing, and masonry.
Mechanical | Engineering | Plumbing
Once the construction company seals the building envelope, the infrastructure of the mechanical, electrical, and plumbing systems can proceed.
Finishes and Fixtures
Once the HVAC, plumbing, and electrical are in, the finishing work can begin. This stage is the final push to complete the project and requires patience and communication to ensure everything goes according to plan.